Project Information

 

Port Yanbu
Location 350km north-east of Jeddah
Infrastructure Existing decline which is 1.8km long with an extra 1.7km of development work
  Existing sealed highway access to Jeddah and Yanbu Port

 

The flagship Jabal Sayid copper and gold project is on track for commissioning in mid 2011 producing 235,000t of copper concentrate. The project is one of the lowest cost of capital per tonne of copper producing project which will also produce gold and silver in concentrate.

The project will produce approximately 57,000t of copper in concentrate per year and the average life of mine head grade through the concentrator will be 2.3% copper and approximately 0.3 g/t gold.

Definitive (Bankable) Feasibility Study Project Information

 

Capital Cost USD$280M
Operating Cost USD$0.97c/lb - Payable
Mining Rate 2.6Mt per annum
Resource 31Mt at 2.3% copper
Reserve 24.4Mt at 2.2% copper
Recovery 94% producing 26% copper concentrate with gold and silver credits
Concentrate Approximately 235,000t with 57,000t contained copper
Mining method Long hole open stope
Current infrastructure 1.8km decline, camp facilities for 80 persons and offices

 

The Definitive Feasibility Study Report was completed in December 2009.